Clarke IRD40 Specifications Page 9

  • Download
  • Add to my manuals
  • Print
  • Page
    / 20
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 8
9
Parts & Service: 020 8988 7400/E-mail:[email protected] or [email protected]
HEATER OPERATION WITHOUT PEOPLE IN THE ROOM
Ensure that sufficient air is available via windows and doors for complete
combustion. The heated volume (m
3
)/ heat output (kW) ratio must be at least
10:1, and personnel should not stay permanently in the heated room.
HEATER OPERATION WITH PEOPLE REMAINING IN THE ROOM
If people are to remain in the room for any length of time, the heated volume
(m
3
) /heat output (kW) must be at least 30:1. Air circulation must be ensured
through windows and doors or permanent openings near the floor and
ceilings, whose total open area (m
2
) is at least 0.003 times the total heat
output (kW).
OPERATION
In normal operation, operating the ON/OFF switch will illuminate the red LED
and the green and orange warning lights. After two minutes, when the fuel
warming operation is completed, the orange warning light and the red LED
go out and the motor starts.
The following table shows the main operating phases.
LIGHTING THE HEATER / START-UP
To start the heater;
1. Check that there is diesel in the fuel tank.
2. Switch the ON/OFF switch to ON.
The green and orange LEDs will light up for the duration of the pre-heating
time.
Ignition does not take place immediately but after a pre-heating time
followed by a ‘pre-purge’ time of about 30 seconds.
retaeh-erP noitarepO noitalitnev-tsoP yb-dnatS
neerGegnarOneerGegnarOneerGegnarOneerGegnarO
NO
FFO
hctiwS
I )NO(
hctiwS
I )NO(
hctiwS
O )FFO(
hctiwS
O )FFO(
Page view 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 19 20

Comments to this Manuals

No comments